| Item | Design example |
|---|---|
| Market | Germany / European three-phase residential applications |
| Battery configuration | 3 × 15.36 kWh MERITSUN LiFePO4 batteries |
| Nominal stored energy | 46.08 kWh |
| Inverter | Three-phase hybrid inverter; model must be selected and verified for the project |
| PV array | To be confirmed from the roof design and site data |
| Primary use | Solar self-consumption, managed backup or a combination of both |
| Installation location | Indoor utility room shown as a design example |
| Evidence boundary | No customer load data, operating SOC, runtime or commissioning result is claimed |
This configuration is intended for a larger residence that needs more stored energy than a single battery can provide. Possible objectives include increasing solar self-consumption, supporting selected circuits during an outage and maintaining an energy reserve for evening or overnight demand.
The final use case must be defined before equipment is ordered. A system designed primarily for daily solar cycling may use a different SOC strategy from a system that must preserve emergency reserve capacity.
The battery stores energy in kWh. The inverter determines how much power can be delivered, how that power is distributed and how the system interacts with the home’s electrical service.
For a three-phase residence, the installer should document:
Three batteries do not automatically create three-phase backup. That function depends on the approved inverter architecture, communication design and distribution plan.
A useful site survey separates loads into three groups.
These may include refrigeration, communications, lighting, controls, security equipment and selected receptacles.
These may include selected heat-pump circuits, ventilation, home-office equipment and living-area circuits. Their inclusion depends on inverter output and the required backup duration.
Electric water heating, EV charging, cooking equipment, pumps and large HVAC loads may need scheduling, load control or exclusion from backup operation.
The installer should record watts, running hours and starting demand for every circuit included in the backup plan.
The 46.08 kWh figure describes nominal stored energy. It does not establish the system’s continuous power, surge capability or runtime.
A preliminary runtime estimate can be expressed as:
Estimated runtime = usable battery energy × conversion efficiency ÷ average backed-up load
The result is only a planning estimate. Actual runtime changes with SOC limits, temperature, inverter losses, battery current limits, load cycling and the amount of solar available during operation.
Before quoting the system, the installer or integrator should confirm:
“Compatible with 51.2 V batteries” is not sufficient by itself. The selected inverter and the complete battery bank must be validated as a system.
The concept image shows three batteries, an inverter and distribution equipment in one utility room. A real installation must also account for:
Equipment should be positioned so an installer can isolate, inspect and replace components without dismantling the entire system.
The project is not complete when the equipment turns on. The commissioning record should confirm:
Only measured site results should be reported as project performance.
MERITSUN can review a preliminary configuration when the project team provides:
It may provide substantial backup energy, but “whole-home” capability also depends on inverter output, surge demand, load scheduling, SOC reserve and solar availability. A circuit-level load schedule is required before making that claim.
Not necessarily. Battery grouping and phase behavior are determined by the inverter and system architecture. The design must follow the equipment manufacturer’s approved configuration.
Possibly, but the installer must identify the existing inverter topology, operating voltage, communication requirements and whether the project will be AC-coupled or DC-coupled.
The minimum SOC should reflect the customer’s backup objective, expected outage risk, daily cycling strategy and manufacturer limits. It should be documented during commissioning.
That depends on continuous and starting power, phase allocation and the inverter’s output capability. High-demand loads may require scheduling or load management.
No. It is a MERITSUN solution concept created to explain design and procurement decisions. No customer identity, runtime or commissioning result is represented.
At minimum: service topology, inverter model, PV capacity, load schedule, required runtime, installation environment, project quantity and delivery schedule.
Are you planning a three-phase residential storage project? Send MERITSUN the country, grid configuration, inverter model, PV capacity, main loads, required backup time, installation environment and project quantity for a preliminary configuration review.
Discuss Your Project with MERITSUN