loading

MERITSUN Battry - The Best Battery Energy Storage System & Lithium Battery Solutions Provider.

build a 1s or 3.7 volt lithium ion battery pack - 3.7 volt lithium ion battery

build a 1s or 3.7 volt lithium ion battery pack  -  3.7 volt lithium ion battery

After trying many different unit configurations, I found a 3. 7 volt pack (
One without serial unit configuration)
Very simple and cheap.
This is simpler because you don't have to worry about the different cells being discharged at different speeds.
For example, in a 4S package, one unit may consume earlier than the other, leaving a lot of unused energy in the other unit.
You don't need to balance the cost with a 1 s package.
Cheaper because 1 s PCBs are much cheaper.
The only drawback of the 1 s package is the voltage range (2. 5 to 4. 2 volts)
Not as useful as higher voltages.
Nevertheless, I find this package very useful and in this manual I will show you how to make a package and how to use it.
This project assumes that you already know how to weld and splice wires.
In addition, lithium batteries can be dangerous if handled improperly.
Go to this page of my other instructable for a detailed warning of everything that might go wrong.
This is the pcb I use in batteryspace.
Even the highest rated current is only $2. 50.
The price is $21 compared to the cheapest 5S PCB.
Wiring is very simple.
The lead of the battery is on one side, the lead of the charging and traction power supply (
Share the same touch point)
On the other side.
I used European terminal blocks to make sure I only need to weld the PCB once.
Because the lithium ion battery is very unstable, PCB must be used to protect the battery. Lithium-
If the ion batteries overcharge or exceed the current limit, they may be destroyed or even on fire.
In my opinion, their most useful function is to prevent the battery voltage from falling below 2. 5 volts. Lithium-
If the ion batteries are allowed to discharge below 2, they are destroyed. 5 volts.
Once the lower limit is reached, the PCB will turn off the circuit.
If you short circuit, the PCB will turn off the circuit and will not turn on again unless you repair the short circuit and plug the charger into the power supply.
Also, the first time you put the package together, it may not work until you apply for 4.
Charging/power lead 2 V on PCB.
This may be necessary even if the battery is mostly charged. Applying 4.
2 volts will open the PCB.
The PCB can prevent the PCB itself from producing a short circuit, but it is still possible to cause a short circuit directly from the battery.
In this case, the PCB does not save the package.
Although many batteries can be charged at the same time by "charging" through the first battery, I do not recommend doing so.
It is not dangerous to do so, but what happens is that the battery close to the charger is first charged, and then the charger turns off once it is detected that the first battery has reached 4. 2 volts.
Other batteries under the line absorb the charge so slowly that they are not fully charged when the first one is charged.
Make sure there is a direct electrical path from the charger to each battery.
In the picture you will see 5 battery stands, 4 18650 each.
Later I thought there was too much juice so I took 3 packs.
This is the advantage of this package as I can customize it based on the capacity I need.
Riding a bike in town, I use 8 cells, but I may use all 20 cells during a long bike trip.
I just need a screwdriver to mark or remove the cell.
I separate the battery boxes with cardboard and plastic sheets to make sure they don't short.
Buy a smart charger
This is what you use.
It is designed for packaging for at least 6 amp hours.
My package is about 12 am hours.
It should take 2 hours to charge.
12 am p hour pack/6 amp charger = 2 hour charge time I cut the crocodile clips off the charger and attach them to the charging leads on the PCB.
I use this bag on my bike.
It powers my bike lights and my phone.
XM with light of 1300 lumens-L T6 C8.
It is powered by a lithium-ion battery of 18650.
I realized that I could weld the wires to the positive and negative contacts on the lamp and run from the external battery pack.
My external packaging has 8 18650 s in parallel so the lights can now last 8 hours instead of 1 hour full of electricity.
Another use is to charge my phone.
I found a small upgraded switch mode power regulator in Dimension engene.
It is perfectly designed to get 3 different outputs.
7 V nominal package and lift it to the 5 V required to charge the phone.
There is a way to charge your phone during long bike trips that is very useful.
When I use my phone's gps navigation, the battery runs out in 2 minutes. 5 hours.
With outfitting (
All 20 cells)
I can extend it to about 75 hours!
I will be cycling around the US this summer and I would like to use the gps log mobile app called "My track" to record every mile of my journey.
I will charge at restaurants and hostels whenever there is a chance.
This is easy to do as the package and charger are placed in my removable handle bag.

GET IN TOUCH WITH Us
recommended articles
Knowledge Successful case News
Greenhouse Battery Backup Planning: Controls, Pumps, Fans and Lighting
Plan greenhouse battery backup by prioritizing controls, alarms, irrigation, fans, pumps and lighting, then checking startup power, runtime, SOC reserve and transfer behavior.
How to Size Battery Backup for a Small Studio or Home Business
Size battery backup for a studio, shop or home business by defining critical loads, peak power, usable energy, transfer needs, SOC reserve and recharge strategy.
IP65 Outdoor Home Battery Installation: What Installers Must Verify Beyond the Rating
Learn what IP65 covers, what it does not, and what installers must verify for outdoor home batteries: location, heat, drainage, corrosion, cable entries and commissioning.
What Information Is Needed for a Residential Energy Storage Quote?
Use this residential ESS RFQ checklist to submit the grid, load, PV, inverter, backup, site, approval and commercial data needed for a usable quote.
How to Compare Home Battery Quotes: A Bid-Normalization Guide for Installers and Distributors
A practical bid-normalization guide for comparing home battery energy, power, inverter scope, approvals, commissioning, warranty and support.
Nominal vs. Usable Home Battery Capacity: What Installers Should Calculate Before Quoting Runtime
Learn how nominal kWh, starting SOC, reserve settings, conversion losses and load profile determine usable home-battery energy and backup runtime.
Is 128 kWh Enough for Whole-Home Backup? Inside a Caribbean Residential Installation
See how a 128 kWh MERITSUN battery bank, 28.8 kWp solar array and Schneider inverter platform support whole-home backup in Punta Cana.
Project Complete: 48 kWh Whole-Home Storage With Three MSP-6KW Units
A 48 kWh MERITSUN home storage system is now in service, using three 6 kW all-in-one units to support separate household load groups.
60 kWh Farm Battery Storage in the U.S.: What This 12-Module Project Shows
Analyze the design logic behind a U.S. farm project using 12 parallel MERITSUN battery modules, a 60 kWh-class battery bank and a Schneider inverter.
Home Battery Sizing Guide for Solar Installers: 10kWh, 20kWh and 30kWh Systems
A practical MERITSUN home battery sizing guide comparing 10kWh, 20kWh and 30kWh systems for solar installers, EPCs, dealers and distributors.
Established in 1999, we have 20+ years of energy professional experience and integrated solutions services in energy storage application industrial, and further reach the demands the smart & green energy era. 
Copyright ©1999-2025 MeriTech Power Limited - www.meritsunpower.com | All Rights Reserved | Sitemap | Privacy Policy
Customer service
detect