loading

MERITSUN Battry - The Best Battery Energy Storage System & Lithium Battery Solutions Provider.

Dig out gold from e-waste - printed circuit board assembly

Dig out gold from e-waste  -  printed circuit board assembly

Waste disposal has been considered a dirty job for many years, but when you start to get gold and silver, and get obvious profits while dealing with waste, the same waste will be the best.
Waste disposal has been considered a dirty job for many years, but when you start to get gold and silver, and get obvious profits while dealing with waste, the same waste will be the best. E-
Parisaraa in Bangalorebased e-
The waste management company proves that this is correct by recovering 500 gm gold from printed circuit board strips and 1.
5 kg silver from coating assembly. E-
Parisaraa has a tie.
Manage e-commerce with about 300 companies
Waste effectively.
P Parthasarathy, general manager of E-E, said: "We recovered 500 gm gold from 36 tons of selective circuit boards last year and 1,500 gm silver from coating assembliesParisaraa. The e-
Waste management companies in the Dabaspet industrial zone recycle abandoned, abandoned computers, peripherals, printers, fax machines, copiers, CDs, soft films, tapes, cartridges, printed circuit boards, motherboards and components of refrigerators, telecom equipment, telephone, mobile phone, pager, audio and video equipment, washing machine, microwave oven, air conditioner, fluorescent lamp and CFL lamp and battery.
"Our goal is to recycle materials to the maximum, not
"Incineration, minimum power consumption, minimum water consumption and minimum landfill sites," said parthasarathhy . ".
Seven benefits, including protecting the environment, saving limited resources, improving energy efficiency, building a strong economy, creating jobs, building communities and economic returns, he said. “We have a tie-
There are several watch manufacturers.
"We have been using gold recovered from printed circuit board strips and components to plated the watch," he said . ".
The company was founded in 2004 and received income from Rs5 crore in 2010
Rs7 crore in 11 and 2011-
Employment was provided to approximately 100 employees, most of whom were from rural areas.
Now, the company plans to sign a memorandum of understanding with the state government to establish a scrap vehicle unit near Dabaspet.
It decided to invest in Rs36 crore in that proposed unit.
"This is the first of its kind in the country.
We have been asking the state government to allocate 10 acres of land near dabaster.
"If everything goes as planned, the ELV department will be operational next year," he said . ".
In elaborating on the ELV department, he said that if the government decides to cancel 15-year-old vehicles.
"The demolition of scrapped cars will be carried out without polluting the environment.
We might get a four.
Wheeler and triple double-and-three-
"It's going to take out cars every day," he said . ".

GET IN TOUCH WITH Us
recommended articles
Knowledge Successful case News
Greenhouse Battery Backup Planning: Controls, Pumps, Fans and Lighting
Plan greenhouse battery backup by prioritizing controls, alarms, irrigation, fans, pumps and lighting, then checking startup power, runtime, SOC reserve and transfer behavior.
How to Size Battery Backup for a Small Studio or Home Business
Size battery backup for a studio, shop or home business by defining critical loads, peak power, usable energy, transfer needs, SOC reserve and recharge strategy.
IP65 Outdoor Home Battery Installation: What Installers Must Verify Beyond the Rating
Learn what IP65 covers, what it does not, and what installers must verify for outdoor home batteries: location, heat, drainage, corrosion, cable entries and commissioning.
What Information Is Needed for a Residential Energy Storage Quote?
Use this residential ESS RFQ checklist to submit the grid, load, PV, inverter, backup, site, approval and commercial data needed for a usable quote.
How to Compare Home Battery Quotes: A Bid-Normalization Guide for Installers and Distributors
A practical bid-normalization guide for comparing home battery energy, power, inverter scope, approvals, commissioning, warranty and support.
Nominal vs. Usable Home Battery Capacity: What Installers Should Calculate Before Quoting Runtime
Learn how nominal kWh, starting SOC, reserve settings, conversion losses and load profile determine usable home-battery energy and backup runtime.
Is 128 kWh Enough for Whole-Home Backup? Inside a Caribbean Residential Installation
See how a 128 kWh MERITSUN battery bank, 28.8 kWp solar array and Schneider inverter platform support whole-home backup in Punta Cana.
Project Complete: 48 kWh Whole-Home Storage With Three MSP-6KW Units
A 48 kWh MERITSUN home storage system is now in service, using three 6 kW all-in-one units to support separate household load groups.
60 kWh Farm Battery Storage in the U.S.: What This 12-Module Project Shows
Analyze the design logic behind a U.S. farm project using 12 parallel MERITSUN battery modules, a 60 kWh-class battery bank and a Schneider inverter.
Home Battery Sizing Guide for Solar Installers: 10kWh, 20kWh and 30kWh Systems
A practical MERITSUN home battery sizing guide comparing 10kWh, 20kWh and 30kWh systems for solar installers, EPCs, dealers and distributors.
Established in 1999, we have 20+ years of energy professional experience and integrated solutions services in energy storage application industrial, and further reach the demands the smart & green energy era. 
Copyright ©1999-2025 MeriTech Power Limited - www.meritsunpower.com | All Rights Reserved | Sitemap | Privacy Policy
Customer service
detect