loading

MERITSUN Battry - The Best Battery Energy Storage System & Lithium Battery Solutions Provider.

dtpc set to give mangalam dam an eco-tourism makeover | kochi news - times of india - solar street light with battery

dtpc set to give mangalam dam an eco-tourism makeover | kochi news - times of india  -  solar street light with battery

Council for the promotion of regional tourism (PALAKKAD)DTPC)
The giant Mangalam Dam ecological restoration project has been started
Tourism projects in the region were put into use in 2011 at a cost of more than Rs 5.
Although the project was open to the public five years ago, the lack of infrastructure and amenities in the new tourism center did not attract tourists.
A special duty officer at DTPC Jayakumar said the existing tourist center at the 25-acre Mangalam Dam would be cleared and renovated.
More amenities will be provided to visitors, including drinking water, boat rides in a reservoir with batteries or boats operated by solar energy, so that the water will not be contaminated, he said, because it is used for drinking, also used for irrigation.
In 1966, Alathur taluk in Palakkad district completed and opened the irrigation canal system.
The government order of June 16, 2008 occupied the first phase of the ecosystem
According to the tourism project, the Mangalam Dam was built on Cherukunnapuzha, a tributary of the Mangalam River.
Located 48 km kilometers south of the town of Palakkad, the dam is a popular picnic spot.
The reservoir is located on the edge of the forest area, where there are deer, wild elephants and many kinds of birds.
There are also beautiful parks and lawns decorated with statues.
Hundreds of tourists visit the place every day.
With this in mind, the Mangalam Dam will develop into a tourist destination with financial assistance of RS 461. 67 lakh. " Rs.
65 lakh were allocated for the convenience of the center and the video room; Rs 99.
RS 24 for landscaping on the waterfront.
Boat terminal 67 lakh; Rs 67.
50 lakh and 23 rupees for general landscaping.
72 island landscape.
However, after the completion of the tourism center, the authorities did not ensure that it was properly maintained.
They have not been able to add more facilities and infrastructure such as good roads, street lights and lighting facilities to their meals in the wild.
The renovation project will repair and renovate existing facilities and add more facilities to make them a major ecological environment.
Jayakumar says this is the tourist center of the state.
Download the India Times news app in the latest city.

GET IN TOUCH WITH Us
recommended articles
Knowledge Successful case News
Can You Add a Battery to an Existing Solar System? AC-Coupled vs. DC-Coupled Retrofit Guide
Learn when an existing solar system can be retrofitted with battery storage, how AC- and DC-coupled designs differ, and what installers must inspect first.
UN 38.3 vs. IEC 62619 vs. UL 1973: A Battery Document Checklist for Distributors and Installers
Learn what UN 38.3, IEC 62619 and UL 1973 cover, what they do not prove, and which product documents distributors and installers should verify.
How to Compare Home Battery Warranties: Years, Cycles, Throughput and Capacity Retention
Compare home battery warranty years, cycle limits, energy throughput, capacity retention, operating conditions and exclusions before selecting a supplier.
What Is Battery C-Rate? How Charge and Discharge Limits Affect Home ESS Power
Understand 0.5C, 1C and other battery C-rates, how to convert current into power, and why the BMS and inverter may limit real home ESS output.
How to Read a Home Battery Datasheet: 12 Specifications Installers Should Verify Before Quoting
Learn how to evaluate capacity, voltage, current, power, cycle life, temperature limits, communications, certifications and warranty terms before quoting a home battery.
How to Size Solar Recharge for a Home Battery During an Extended Outage
Estimate the PV array needed to recharge a home battery during an outage using battery energy, daytime loads, sun hours, system losses and charge-power limits.
How to Scope a 120/240V Split-Phase Home Battery Project
Scope a 120/240V split-phase home battery project correctly. Review L1/L2 loads, 240V equipment, inverter output, battery current, backup architecture and handover.
LiFePO4 Home Battery Charging Below Freezing: What Installers Must Verify
Learn what installers must verify before charging a LiFePO4 home battery in freezing weather, including BMS limits, heating logic, placement and commissioning records.
Greenhouse Battery Backup Planning: Controls, Pumps, Fans and Lighting
Plan greenhouse battery backup by prioritizing controls, alarms, irrigation, fans, pumps and lighting, then checking startup power, runtime, SOC reserve and transfer behavior.
How to Size Battery Backup for a Small Studio or Home Business
Size battery backup for a studio, shop or home business by defining critical loads, peak power, usable energy, transfer needs, SOC reserve and recharge strategy.
Established in 1999, we have 20+ years of energy professional experience and integrated solutions services in energy storage application industrial, and further reach the demands the smart & green energy era. 
Copyright ©1999-2025 MeriTech Power Limited - www.meritsunpower.com | All Rights Reserved | Sitemap | Privacy Policy
Customer service
detect