This is the pursuit of e-commercespeed. . .
I'm not talking about the dotcom bubble.
"These instructions are expected to be proof of concept for a larger plan.
The project used two scooters.
Both of them were found to have been thrown away at Stanford University.
Diving in garbage bins may or may not be illegal.
But it's better to ask for forgiveness later.
The first scooter was rusty, not at all. ridable.
It's a 36 v machine.
The second is the model of 24 v, the battery pack is highly sulfuric acid.
If you can get an electric charger, get rid of it: I picked up a battery charger for other items from Port Freight ---
I spent $10 and that's what I really needed--lets get to it.
I did this hack with 3 12 v gel batteries on the 36 v scooter
The 24 v sulfuric acid packaging will be broken down at a later date.
These need to be charged.
I charge them for 1.
5A "smart" charger using multimeter and ammeter to monitor progress.
It's a proof of concept, a pretty dirty hack-
So, things are twisted and clipped together.
This is where it gets tricky. . .
Your connector may well not match--mine didn't.
The best way to do this is to start with a connector.
See if both sides mate.
If they do, more. If Not -
Check the other side of the connector on the other scooter.
Then remove the pin from the connector for Frankenstein exchange.
The pin usually has a small faucet inside-
Push it to the side with a small screwdriver and pull out the wire/pin.
Sometimes there is no remedy.
In this case-
You can insert the needle on the wire into the connector and then fix it with tape.
Make sure they don't short circuit inside the tape as these motor controllers are very sensitive:/you definitely need to connect the following items s1.
Hall effect throttling. Motor3.
For the sake of safety, you should also connect the brake switch.
I can't get the pin out of the power switch--
I don't want to either because I need to move 4 different connectors.
The power switch is turned on when turned off and off when turned on.
My solution is to stick a metal screwdriver inside, cut the pin short and stick it with tape.
Not elegant at all
But the idea is practical.
This is a big question mark.
In fact, the 36 v motor does match the motor bracket on the scooter.
However, the Axis offset is different when the chain is thrown out of alignment. Solution --
Make adapter board. . . . Dirty solution-
The biggest problem with the motor using the 24 v specification is the weather, whether the 24 V motor can handle the new voltage and current. . . .
I used my ammeter between the battery and the controller--
So I can monitor the draw.
It is also a handy power indicator. .
01A draw indicates that the controller is on (the switch circuit is off ).
When you connect everything together-
Connect the battery for the second time and the power switch for the last time.
It may also be a good idea to do a "dry run ---
Motor not connected to rear wheels (via chain ).
Make sure all connections are tight before booting--and insulated.
The last thing you want is to make things short accidentally.

GET IN TOUCH WITH Us
recommended articles
Knowledge Successful case News
How Long Will a 10 kWh Battery Run a House? A Practical Runtime Guide
Runtime depends on the usable SOC window, conversion efficiency and average backed-up load. Formula, worked example and planning table for 8–15.36 kWh.
Wall-Mounted vs. Floor-Standing Home Batteries: 9 Checks Installers Should Make
Wall-mounted or floor-standing home battery? Run these 9 checks first: wall load, clearances, cabling, environment, inverter communication, expansion.
8 kWh vs. 10 kWh vs. 15.36 kWh Home Batteries: A Load-Shedding Sizing Guide
Compare 8 kWh, 10 kWh and 15.36 kWh home batteries for load-shedding projects — backed-up load, usable capacity, inverter output and reserve, explained.
How to Plan a 30.72 kWh U.S. Home Backup System Around the Load Panel
Learn how to plan a 30.72 kWh U.S. home battery system around a backup-load panel, split-phase service, surge demand and solar recharge.
How to Design a 46.08 kWh Three-Phase Home Battery System for a German Residence
See how installers can plan a 46.08 kWh three-phase home battery system for a German residence, including loads, inverter compatibility and protection.
Can You Add a Battery to an Existing Solar System? AC-Coupled vs. DC-Coupled Retrofit Guide
Learn when an existing solar system can be retrofitted with battery storage, how AC- and DC-coupled designs differ, and what installers must inspect first.
UN 38.3 vs. IEC 62619 vs. UL 1973: A Battery Document Checklist for Distributors and Installers
Learn what UN 38.3, IEC 62619 and UL 1973 cover, what they do not prove, and which product documents distributors and installers should verify.
How to Compare Home Battery Warranties: Years, Cycles, Throughput and Capacity Retention
Compare home battery warranty years, cycle limits, energy throughput, capacity retention, operating conditions and exclusions before selecting a supplier.
What Is Battery C-Rate? How Charge and Discharge Limits Affect Home ESS Power
Understand 0.5C, 1C and other battery C-rates, how to convert current into power, and why the BMS and inverter may limit real home ESS output.
How to Read a Home Battery Datasheet: 12 Specifications Installers Should Verify Before Quoting
Learn how to evaluate capacity, voltage, current, power, cycle life, temperature limits, communications, certifications and warranty terms before quoting a home battery.
Established in 1999, we have 20+ years of energy professional experience and integrated solutions services in energy storage application industrial, and further reach the demands the smart & green energy era. 
Copyright ©1999-2025 MeriTech Power Limited - www.meritsunpower.com | All Rights Reserved | Sitemap | Privacy Policy
Customer service