loading

MERITSUN Battry - The Best Battery Energy Storage System & Lithium Battery Solutions Provider.

lithium ion battery pack 2019 Kia Niro EV Completes the Lineup with a Specialty Green Model

lithium ion battery pack 2019 Kia Niro EV Completes the Lineup with a Specialty Green Model

From Kia's cars and drivers, Niro is a special green model, just like Toyota's Prius --
Or its Ioniq brothers are modern.
Niro has been offered as a hybrid and plugin hybrid;
Now it's the electric version, Kia Niro EV, complete the big three.
Although Niro is a close relative of Ioniq, the batteries and motors of electric vehicles are stronger --
They are closely related to the new hardware of modern Kona Electric.
Electric motor rotates 201 hp-
Perfect match with Kona appliances
Together with 291-ft of torque. The 64. 0-kWh lithium-
The ion battery pack under the floor also reflects the situation in Kona, offering a range of 239 miles.
Ccs dc fast standard Niro-
Charging settings to recharge the battery to 80% within 75 minutes;
It added about 100 miles in just 30 minutes. Using a 240-
Volt Level 2 charger, about 9 required.
Charge the exhausted battery for 5 hours.
Kia lets the driver choose between four levels of regenerative braking by steering-wheel-
Mounting paddle including brake-and-
Keep the function and allow the paddle to take the car to a complete stop.
In addition, the intelligent Regen system can automatically adjust the braking regeneration level according to the front vehicle deceleration.
Niro EV can be distinguished from other Niro models by the modified front fascia
Turn off the grille, low air intake with a blue accent, "Arrow" graphics in LED daytime running lights.
There is also a blue accent on the rear bumper, 17-
The inch wheel is a special aerodynamic design.
Niro EV will offer two levels of decoration, EX and EX Premium.
It arrived in the United States in early 2019 and will start pricing around $38,000 before the award.

GET IN TOUCH WITH Us
recommended articles
Knowledge Successful case News
How Long Will a 10 kWh Battery Run a House? A Practical Runtime Guide
Runtime depends on the usable SOC window, conversion efficiency and average backed-up load. Formula, worked example and planning table for 8–15.36 kWh.
Wall-Mounted vs. Floor-Standing Home Batteries: 9 Checks Installers Should Make
Wall-mounted or floor-standing home battery? Run these 9 checks first: wall load, clearances, cabling, environment, inverter communication, expansion.
8 kWh vs. 10 kWh vs. 15.36 kWh Home Batteries: A Load-Shedding Sizing Guide
Compare 8 kWh, 10 kWh and 15.36 kWh home batteries for load-shedding projects — backed-up load, usable capacity, inverter output and reserve, explained.
How to Plan a 30.72 kWh U.S. Home Backup System Around the Load Panel
Learn how to plan a 30.72 kWh U.S. home battery system around a backup-load panel, split-phase service, surge demand and solar recharge.
How to Design a 46.08 kWh Three-Phase Home Battery System for a German Residence
See how installers can plan a 46.08 kWh three-phase home battery system for a German residence, including loads, inverter compatibility and protection.
Can You Add a Battery to an Existing Solar System? AC-Coupled vs. DC-Coupled Retrofit Guide
Learn when an existing solar system can be retrofitted with battery storage, how AC- and DC-coupled designs differ, and what installers must inspect first.
UN 38.3 vs. IEC 62619 vs. UL 1973: A Battery Document Checklist for Distributors and Installers
Learn what UN 38.3, IEC 62619 and UL 1973 cover, what they do not prove, and which product documents distributors and installers should verify.
How to Compare Home Battery Warranties: Years, Cycles, Throughput and Capacity Retention
Compare home battery warranty years, cycle limits, energy throughput, capacity retention, operating conditions and exclusions before selecting a supplier.
What Is Battery C-Rate? How Charge and Discharge Limits Affect Home ESS Power
Understand 0.5C, 1C and other battery C-rates, how to convert current into power, and why the BMS and inverter may limit real home ESS output.
How to Read a Home Battery Datasheet: 12 Specifications Installers Should Verify Before Quoting
Learn how to evaluate capacity, voltage, current, power, cycle life, temperature limits, communications, certifications and warranty terms before quoting a home battery.
Established in 1999, we have 20+ years of energy professional experience and integrated solutions services in energy storage application industrial, and further reach the demands the smart & green energy era. 
Copyright ©1999-2025 MeriTech Power Limited - www.meritsunpower.com | All Rights Reserved | Sitemap | Privacy Policy
Customer service