loading

MERITSUN Battry - The Best Battery Energy Storage System & Lithium Battery Solutions Provider.

ni mh rechargeable battery New Cost-Effective IOB 4000 Monitors EUT during EMC Immunity Testing with 12 Digital Inputs

ni mh rechargeable battery New Cost-Effective IOB 4000 Monitors EUT during EMC Immunity Testing with 12 Digital Inputs

Edison, N.J.Tecteseq Inc, August 2009.Is a leading developer and supplier of EMC launch and immunity test instruments and systems, introducing a new IOB 4000 (input/output box) for EUT (equipment under test) monitoring During EMC immunity testing.The EUT monitoring function of IOB 4000 is based on the function of the teseq nss NSG 4070 RF conduction immune system.Digital inputs and outputs are combined with analog and optical inputs to improve versatility and functionality.
The new IOB 4000 has 4 digital inputs with a voltage range of 0 V to 24 V and 8 low levelsLevel TTL output, 8 TTL inputs, 4 analog inputs with a voltage range of 0 v to 24 v, and 1 optical input.The IOB 4000 s 12 digital input monitors up to 12 signals.The light source, such as the operating indicator, can be monitored through optical input.
IOB 4000 is a cost-Monitor the effective solution of EUT in EMC immunity testing, providing a large number of different inputs in one box.x93IO-The test software that comes with IOB 4000 allows to test all the features of the box.The test software has the ability to test the communication port;The number of measurements per second can be set;The box can be woken up;The serial number can be read and the battery status can be seen.
All inputs and outputs can be observed on the test screen.IOB 4000 when testing the internal software for integration, the data transfer passes the universal service obligation, 4013 fiber optic interfaces, with RS-232 and USB interface ports.Includes a 10 m fiber optic cable for connecting IOB 4000 in the chamber.
Fiber-Isolated monitoring connections on the input/output ensure that the EUT test has no effect on the monitoring computer.Similarly, the isolation connection also guarantees no impact from the outside of the test room to the EUT.The box's sturdy metal case is optimized for monitoring signals during EMC testing.
The battery power supply of the 4x1, 2 v NiMh rechargeable battery is independent of the power supply to keep running.On fully charged batteries, the IOB 4000 can work 8 hours a day and run for about 1 week.In sleep mode, the current consumption of IOB 4000 during operation is about 6 mA and 26 mA.
Only 1 weight.
8 lbs.
only 6 lbs.
The IOB 4000 is equipped with a storage box of 6 lbs, light weight and compact structure.The IOB 4000 is easy to carry and measures 6.30 inch long, 4.45 inch wide 2.36 inches high.Storage case measures 17.72 inch long, 14.17 inch wide, 5.32 inches high.The price of the whole system starts at $2,990.
For more information, please visit http: // www.teseq.Com or contact maryeq Inc.52 Mayfield Avenue Edison, New YorkJ.08837.Tel: (732) 417-0501 ext.239;Fax: (732) 417-0511;E-Mail: [mailbox]xa0Protection ).URL: http: // www.teseq.com.Please visit http:/www for an electronic copy.
simongroup.
Com/news/WordDocs/tes/TES-A-2121.
http://www.
simongroup.
Com/news/image/teseq/TES-A-2121.
Other press releases on Teseq Inc.
, Please visit http: // www.
simongroup.
Com/news/teseq.
Subscribe to the RSS feed for teseq.

GET IN TOUCH WITH Us
recommended articles
Knowledge Successful case News
How Long Will a 10 kWh Battery Run a House? A Practical Runtime Guide
Runtime depends on the usable SOC window, conversion efficiency and average backed-up load. Formula, worked example and planning table for 8–15.36 kWh.
Wall-Mounted vs. Floor-Standing Home Batteries: 9 Checks Installers Should Make
Wall-mounted or floor-standing home battery? Run these 9 checks first: wall load, clearances, cabling, environment, inverter communication, expansion.
8 kWh vs. 10 kWh vs. 15.36 kWh Home Batteries: A Load-Shedding Sizing Guide
Compare 8 kWh, 10 kWh and 15.36 kWh home batteries for load-shedding projects — backed-up load, usable capacity, inverter output and reserve, explained.
How to Plan a 30.72 kWh U.S. Home Backup System Around the Load Panel
Learn how to plan a 30.72 kWh U.S. home battery system around a backup-load panel, split-phase service, surge demand and solar recharge.
How to Design a 46.08 kWh Three-Phase Home Battery System for a German Residence
See how installers can plan a 46.08 kWh three-phase home battery system for a German residence, including loads, inverter compatibility and protection.
Can You Add a Battery to an Existing Solar System? AC-Coupled vs. DC-Coupled Retrofit Guide
Learn when an existing solar system can be retrofitted with battery storage, how AC- and DC-coupled designs differ, and what installers must inspect first.
UN 38.3 vs. IEC 62619 vs. UL 1973: A Battery Document Checklist for Distributors and Installers
Learn what UN 38.3, IEC 62619 and UL 1973 cover, what they do not prove, and which product documents distributors and installers should verify.
How to Compare Home Battery Warranties: Years, Cycles, Throughput and Capacity Retention
Compare home battery warranty years, cycle limits, energy throughput, capacity retention, operating conditions and exclusions before selecting a supplier.
What Is Battery C-Rate? How Charge and Discharge Limits Affect Home ESS Power
Understand 0.5C, 1C and other battery C-rates, how to convert current into power, and why the BMS and inverter may limit real home ESS output.
How to Read a Home Battery Datasheet: 12 Specifications Installers Should Verify Before Quoting
Learn how to evaluate capacity, voltage, current, power, cycle life, temperature limits, communications, certifications and warranty terms before quoting a home battery.
Established in 1999, we have 20+ years of energy professional experience and integrated solutions services in energy storage application industrial, and further reach the demands the smart & green energy era. 
Copyright ©1999-2025 MeriTech Power Limited - www.meritsunpower.com | All Rights Reserved | Sitemap | Privacy Policy
Customer service