loading

MERITSUN Battry - The Best Battery Energy Storage System & Lithium Battery Solutions Provider.

numerical simulation and fatigue life estimation of bga packages under random vibration loading - printed circuit board assembly

numerical simulation and fatigue life estimation of bga packages under random vibration loading  -  printed circuit board assembly

Finite element study for this work (FE)
Simulation of ball grid array and prediction of fatigue life (BGA)
Under random vibration load
Printed circuit board (PCB)
Test the Assembly under random vibration load.
Record the center displacement response and failure time of the PCB assembly.
The 3D finite element model of PCB components is established by using finite element software, and the spectrum analysis of random vibration is carried out to obtain the response power spectral density (PSD)
PCB components.
The simulation results show that in the actual random vibration test, the center displacement response has a good correlation with the experimental data, and the validity of the proposed finite element model is verified.
In particular, the average root variance (RMS)
The maximum Peel stress values under different load conditions are calculated and compared. Different pre-
In order to study the influence of the reliability of its butt welding point, the tightening force and vibration strength are applied.
Finally, according to the Miner rule and random vibration theory, the fatigue life of BGA solder joints under random vibration load is determined. the experimental verification, the predicted fatigue life of BGA solder joints and the experimental results have reasonable accuracy.
It is concluded that the solder joints of the BGA package four most lateral corners have higher Peel stress values than other solder joints, especially on both sides of the solder joints near the PCB and the BGA.
As the vibration load increases, the stress response of the critical solder joints increases.
The BGA package is easier to damage and fail when the screws become loose.
This study will provide guidance for the Study of the dynamic properties and optimal design of PCB components and the prediction of the fatigue life of BGA solder joints.

GET IN TOUCH WITH Us
recommended articles
Knowledge Successful case News
Greenhouse Battery Backup Planning: Controls, Pumps, Fans and Lighting
Plan greenhouse battery backup by prioritizing controls, alarms, irrigation, fans, pumps and lighting, then checking startup power, runtime, SOC reserve and transfer behavior.
How to Size Battery Backup for a Small Studio or Home Business
Size battery backup for a studio, shop or home business by defining critical loads, peak power, usable energy, transfer needs, SOC reserve and recharge strategy.
IP65 Outdoor Home Battery Installation: What Installers Must Verify Beyond the Rating
Learn what IP65 covers, what it does not, and what installers must verify for outdoor home batteries: location, heat, drainage, corrosion, cable entries and commissioning.
What Information Is Needed for a Residential Energy Storage Quote?
Use this residential ESS RFQ checklist to submit the grid, load, PV, inverter, backup, site, approval and commercial data needed for a usable quote.
How to Compare Home Battery Quotes: A Bid-Normalization Guide for Installers and Distributors
A practical bid-normalization guide for comparing home battery energy, power, inverter scope, approvals, commissioning, warranty and support.
Nominal vs. Usable Home Battery Capacity: What Installers Should Calculate Before Quoting Runtime
Learn how nominal kWh, starting SOC, reserve settings, conversion losses and load profile determine usable home-battery energy and backup runtime.
Is 128 kWh Enough for Whole-Home Backup? Inside a Caribbean Residential Installation
See how a 128 kWh MERITSUN battery bank, 28.8 kWp solar array and Schneider inverter platform support whole-home backup in Punta Cana.
Project Complete: 48 kWh Whole-Home Storage With Three MSP-6KW Units
A 48 kWh MERITSUN home storage system is now in service, using three 6 kW all-in-one units to support separate household load groups.
60 kWh Farm Battery Storage in the U.S.: What This 12-Module Project Shows
Analyze the design logic behind a U.S. farm project using 12 parallel MERITSUN battery modules, a 60 kWh-class battery bank and a Schneider inverter.
Home Battery Sizing Guide for Solar Installers: 10kWh, 20kWh and 30kWh Systems
A practical MERITSUN home battery sizing guide comparing 10kWh, 20kWh and 30kWh systems for solar installers, EPCs, dealers and distributors.
Established in 1999, we have 20+ years of energy professional experience and integrated solutions services in energy storage application industrial, and further reach the demands the smart & green energy era. 
Copyright ©1999-2025 MeriTech Power Limited - www.meritsunpower.com | All Rights Reserved | Sitemap | Privacy Policy
Customer service
detect